Skip to main content
search
previous arrow
Check-In Hall, Changi Airport Terminal 3, Singapore (Large)
Night View, Changi Airport Terminal 3, Singapore (Large)
View down to Departure Transit Mall, Changi Airport Terminal 3, Singapore
Shopping street at Departure Transit Mall, Changi Airport Terminal 3, Singapore
Kerbside Atrium, Changi Airport Terminal 3, Singapore
Check-In Hall, Changi Airport Terminal 3, Singapore (Large)
Night View, Changi Airport Terminal 3, Singapore (Large)
View down to Departure Transit Mall, Changi Airport Terminal 3, Singapore
Shopping street at Departure Transit Mall, Changi Airport Terminal 3, Singapore
Kerbside Atrium, Changi Airport Terminal 3, Singapore
next arrow
 

Changi Airport Terminal 3, Singapore

Although CPG’s work on Changi Airport stretches far back to the initial Masterplan development stages of the 1970s, it has continued to work on the modernisation of the venue through the years; specifically, the expansion of Terminal 1 and 2. 

Terminal 3 is recognisable from its expansive rectilinear roof, which is a unique horizontal stroke right from the dramatic cantilever over the kerbside, across the Main Departure and Arrival Halls to the aircraft-apron on the other side. Its underlying complexity lies in its details, which are derived from the layering of ceiling panels, baffles, skylights and high-tech ‘butterflies’, creating a random aperture pattern build-up that evokes a rainforest canopy. The natural luminance of the interior spaces is enhanced by the patterns and textures of the floor and feature wall surfaces. The result is a dramatically open and strikingly transparent glass box, which provides spatial continuity with the clarity that passengers seek in transit while warmly receiving its visitors into the sunny tropics. The terminal’s sky-lit main roof stretches from the kerbside to the airside and features expanses of planting that rise through different levels. 

Part of the winning formula is the highly efficient, functional and operational ease-of-use designs of Changi’s first two terminals, which are also imbued with spatial qualities that impart a sense of comfort and convenience. Since its opening in 2008, Terminal 3 has further enhanced Changi Airport’s reputation and ranking as the world’s best, consolidating Singapore’s edge as an aviation hub. To date, CPGairport has completed over 50 airport and related projects worldwide.

Project Details

Project country

Singapore

COMPLETION DATE

2008

SERVICES RENDERED

Architectural Design, Civil & Structural Engineering, Mechanical & Electrical Engineering, Quantity Surveying, Terminal Area Planning & Design, Terminal Planning & Design

AWARDS / YEAR

BCI Green Leadership Award 2010
BCA Green Mark Awards 2010 (Gold)
BCA Design and Engineering Safety Excellence Awards 2010 (Merit)
SIA Architectural Design Awards 2008
BCA Universal Design Awards 2008 (Silver)

Project Member Quotes

Terminal 3 is a dialogue between continuity and change, and was designed to push the ‘Changi Experience’ further. It is modern and expressive, bold in its simplicity, yet friendly and sensitive to human needs.

Ar. Teng Wai Mun

Close Menu